Frequently asked questions

Questions The rumor

Answers to the most frequently asked questions of our clients

How long will the project be implemented

The duration varies depending on the size and type of project. An ordinary kitchen takes from 15 to 25 working days. The bedroom is from 10 to 20 days. Large projects such as furnishing a complete Villa may take from 45 to 90 days. We accurately determine the schedule before starting.

Is there a warranty on the products

Yes, all our products come with a warranty ranging from one to 5 years depending on the type of product and the material used. The warranty includes manufacturing defects and raw materials, and does not include misuse.

What materials are available to you

We offer a wide range of materials including: natural wood (Beech, arrow, suede), high-density MDF, moisture-resistant HDF, and many other materials. Each material has its own advantages and we help you choose the most suitable for your needs and budget.

How is the pricing done

Pricing depends on several factors: the type of material, the size of the product, the complexity of the design, the required accessories. After visiting the site and taking the sizes, we give you a detailed written quotation that includes all the details without any hidden costs.

What are the steps to work with you

1) communication and identification of needs — 2) visiting the site and taking sizes — 3) 3D design and design approval — 4) determining materials and colors — 5) starting manufacturing — 6) follow — up stages — 7) installation and delivery-8) after-sales service.

Can the design be modified after approval

Yes, modifications to the design can be made before the start of manufacturing at no additional cost. After the start of manufacturing, modifications are possible, but may affect the cost and duration depending on the size of the modification required.